Site Waste Management Plans

From April 2008 construction projects worth more than £300,000 were required to have detailed Site Waste Management Plans (SWMP) in place.

There are two levels:-

  • For projects costing between £300,000 and £500,000 - a Standard SWMP is required
  • For projects costing over £500,000 - a Detailed SWMP is required.

Wastecycle has a wealth of experience in assisting customers with SWMPs. As a minimum and in line with the requirements of an SWMP, Wastecycle can:-

  • Identify the types and quantities of waste likely to be generated on site throughout the project
  • Consider and identify the most appropriate waste management options for your project, both on and off site
  • Plan for efficient materials and waste handling, including the supply of recycled or secondary aggregates, mixtures and soils
  • Provide reporting on actual waste types produced and quantities recycled or landfilled
  • Supply appropriate containers, signage and collection services